Biz Opp: City of Bremerton - Sewer Rehabilitation

Biz Opp: City of Bremerton - Sewer Rehabilitation Main Photo

7 Mar 2025


Biz Opps, Government Contracting, APEX Accelerators

The WORK includes rehabilitating sanitary and storm sewer pipes by cure-in-place pipe (CIPP) methods AND the cleaning and video inspection of sanitary and storm sewer pipes in support of future lining projects.

View of City of Bremerton Bid Postings Page


SCHEDULE A: The WORK to be completed includes:

The video inspection and cleaning of approximately 5,422 linear feet of sanitary sewer pipe AND

Rehabilitating approximately 6,545 linear feet of sanitary sewer pipe using heat-cured or ultra-violet (UV) CIPP methods, reinstating side sewers and removing protruding laterals.  Heat-cured CIPP lining methods shall only use products and methods that control the emission of styrene vapors. 


SCHEDULE B: The WORK to be completed includes:

Rehabilitating approximately 1,632 linear feet of storm sewer pipe using the heat-cured or UV CIPP method. Heat-cured CIPP lining methods shall only use products and methods that control the emission of styrene vapors. 

The Work for both schedules also includes installing flow diversion and temporary bypass pumping, temporary traffic control, and all other work as identified in the Contract Documents. 
 

ESTIMATE: $1,000,000
 

PREVIEWING CONTRACT DOCUMENTS: Contract Documents may be previewed at the ARC  Document Solutions website (www.e-arc.com). Go to http://www.e-arc.com/tacoma/, then click on “Quick Links” and “Public Plan room”. Scroll down or search to find the project